Georgia solar utility guide

Georgia Power solar billing and net metering

Georgia Power customers can interconnect eligible rooftop solar, but exported generation should not be assumed to receive full retail value. Current program availability and compensation must be checked directly.

Service territory: Georgia Power service territory | Policy source checked 2026-10-07

Author profile: Marcus Vance. Verify the linked tariff before relying on a savings estimate.

Relevant document effective 2026-01-01. Expiration has not been established for this account; confirm the current source document.

What has actually been checked?

Review attempt: 2026-10-11. Status: policy confirmed.

Official FAQ confirms 2026 avoided cost of 3.2188 cents/kWh plus 4 cents/kWh for the described RNR instantaneous program, and a residential 10 kW AC limit.

Not verified: Confirm enrollment capacity, written RNR tariff and all retail charges. Legacy monthly netting is different.

Source-checked billing details

2026 solar avoided-cost component; other tariff charges can have different effective dates. Policy source checked 2026-10-07; next review due 2026-11-06. This is not a numeric account-tariff import.

Eligibility: Residential RNR eligibility includes a maximum 10 kW AC peak-generating capacity and program capacity limits. Legacy monthly-netting treatment differs.

Schedule: RNR instantaneous netting values exported generation separately from on-site consumption.

  • The 2026 avoided-cost component is $0.032188/kWh; the FAQ also specifies an additional $0.04/kWh.
  • Combined listed export components therefore total $0.072188/kWh for the described program; confirm applicability on the account.

Worked billing example and limitations

For an eligible RNR instantaneous account, 2,000 exported kWh at the described combined 2026 components gives $144.38 in credits. Retail self-use value, basic charges and the written tariff remain separate.

Current planning model

Rooftop solar interconnection with current export program terms

Do not convert this label into a single permanent cents-per-kWh assumption. Open the official source below and verify the tariff that applies to the account and interconnection date.

Advertisement

What to verify before using a savings calculator

  1. CHECK 1

    Confirm which distributed-generation or renewable-resource program is currently available.

  2. CHECK 2

    Verify export compensation, enrollment limits, and settlement rules.

  3. CHECK 3

    Use actual interval or monthly usage when sizing to reduce low-value exports.

  4. CHECK 4

    Review interconnection, meter, insurance, and inspection requirements.

Turn Georgia Power billing rules into a better solar estimate

Start with your last 12 months of kWh usage, then compare the quote's production against that load. Next, separate energy used in the home from energy exported to Georgia Power. Export value should follow the account's tariff, service date, and rate schedule, not a generic retail-rate assumption.

Verify against the primary source

Utility rules change. Wattcrunch records the review date and links to the source rather than presenting this page as a substitute for the tariff.

Open Georgia Power Residential Solar